Page 1 of 1

Work Day, March 9

Posted: Wed Mar 06, 2019 5:13 pm
by S Lance
The next club work day will be this upcoming Saturday, March 9th.

All members are urged to contribute if possible, as every little bit helps.

Projects include building and repairing target stands and bases and repairing walls and props including the double stack barrels. Additionally, the ranges could use the gravel smoothed out in places and holes filled, and some of the ditches and culverts need cleaned.

It would be helpful to bring drills and screwdrivers, and shovels and garden rakes.

Thanks to everyone that can make it!